Monday, May 7, 2018

More poor design on Luas

More poor design on the Luas.

Behind one of the cross rails there is an electronic destination board. The design fault means that the destination board is not visible to a significant  number of passengers.

Yesterday evening it took an evening Luas 42 minutes to travel from Broombridge to Milltown.

On a quiet Bank Holiday Sunday that seems too long to travel such a distant.



No comments:

Featured Post

The birth of RTÉ and Vladimir Putin’s rise to power

  On this date, December 31, 1961 RTÉ was born. And on the same date, this time 1999, on the resignation of Russia’s first president, Prime...